As expected New Glenn delayed, now April 2026 and no reason to not expect more delays.
NG 3 was originally scheduled for Jan 3rd with their Lunar Lander prototype. As previously mentioned the lander has been replaced in NG3 and it and all other NG flights scheduled for December, an obvious placeholder for "we don't know when".
Not a good image for their "rapidly reusable" NG booster.
Edit: I neglected to mention the super heavy booster had a static fire with 10 engines installed. It only ran about 6 seconds due to an issue (undefined) with the ground systems. The catch points have been integrated with 2 of the 3 grid fins (reduced from 4).
Starship has had new tests specifically on the flaps (all 4)
The new tower has had its first modification, a heavy duty roof (seems the Starship may fly right over it on landing with engines running). Lots of work on going with the old tower as well.
The new assembly building? Looks like they are planning for a big future, at least some of the doors are 90 meters tall (~295' 3"). The V1 booster is only 60 meters, V2 71 meters, V3 is 72.3 meters.
Edit 2: A date has been set for New Glenn Fri Apr 10th, 2026